Assessment of cost overrun causes in construction projects: A case study of residential buildings

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Research
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Cost Overrun in Construction Projects
  • 2.2Causes of Cost Overrun in Construction Projects
  • 2.3Impact of Cost Overrun on Construction Projects
  • 2.4Strategies for Cost Control in Construction Projects
  • 2.5Best Practices for Cost Estimation in Construction Projects
  • 2.6Technology and Cost Management in Construction Projects
  • 2.7Case Studies on Cost Overrun in Construction Projects
  • 2.8Cost Overrun Trends in the Construction Industry
  • 2.9Cost Overrun Mitigation Measures
  • 2.10Benchmarking Cost Overrun in Residential Buildings

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Design
  • 3.2Data Collection Methods
  • 3.3Sampling Techniques
  • 3.4Data Analysis Procedures
  • 3.5Questionnaire Design
  • 3.6Interviews and Surveys
  • 3.7Ethical Considerations
  • 3.8Data Validation Techniques

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • 4.1Overview of Research Findings
  • 4.2Analysis of Cost Overrun Causes in Residential Buildings
  • 4.3Comparison of Cost Overrun Factors in Different Construction Projects
  • 4.4Impact of Project Size on Cost Overrun
  • 4.5Recommendations for Cost Overrun Prevention
  • 4.6Implementation Strategies for Cost Control Measures
  • 4.7Stakeholder Engagement in Cost Management
  • 4.8Future Research Directions

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • 5.1Conclusion
  • 5.2Summary of Research Findings
  • 5.3Implications for the Construction Industry
  • 5.4Contributions to Knowledge
  • 5.5Recommendations for Practitioners
  • 5.6Areas for Future Research

Project Abstract

**** Cost overruns in construction projects are a prevalent issue that can significantly impact project outcomes, budgets, and timelines. This research aims to assess the causes of cost overruns in construction projects, focusing on residential buildings as a case study. The study will investigate various factors contributing to cost overruns, such as inaccurate cost estimates, scope changes, design errors, material price fluctuations, and labor costs. By analyzing these causes, the research seeks to provide insights and recommendations to mitigate the risk of cost overruns in construction projects. The research methodology will involve a comprehensive literature review to explore existing studies, theories, and best practices related to cost overruns in construction projects. This will provide a theoretical framework for understanding the factors that influence project costs and contribute to overruns. Additionally, a case study approach will be utilized to examine specific instances of cost overruns in residential building projects, allowing for a detailed analysis of real-world scenarios and challenges. Data collection methods will include interviews with industry professionals, surveys, and analysis of project documentation to identify common causes of cost overruns and their impact on project success. The research will employ both qualitative and quantitative analysis techniques to evaluate the data collected and draw meaningful conclusions. The findings of this research are expected to shed light on the root causes of cost overruns in construction projects, particularly in the context of residential buildings. By identifying these causes and understanding their implications, stakeholders in the construction industry can implement strategies to prevent or mitigate cost overruns, ultimately improving project outcomes and efficiency. In conclusion, this research contributes to the body of knowledge on cost overruns in construction projects, with a specific focus on residential buildings. The study provides valuable insights into the factors that lead to cost overruns and offers practical recommendations for addressing these challenges. By addressing the root causes of cost overruns, stakeholders can enhance project management practices and achieve better cost control in construction projects.

Project Overview

The project titled "Assessment of cost overrun causes in construction projects: A case study of residential buildings" aims to investigate and analyze the factors contributing to cost overruns in construction projects, particularly focusing on residential buildings. Cost overruns are a prevalent issue in the construction industry and can have significant implications on project outcomes, including delays, disputes, and financial losses. By conducting a detailed analysis of cost overrun causes in the context of residential construction projects, this research seeks to provide valuable insights and recommendations for mitigating these challenges. The study will involve a thorough review of existing literature on the topic to establish a theoretical framework and identify key factors that have been linked to cost overruns in construction projects. Additionally, a case study approach will be employed to examine specific instances of cost overruns in residential building projects, allowing for a deep dive into real-world scenarios and the identification of project-specific factors contributing to cost escalation. The research will explore various factors that can lead to cost overruns, including inaccurate cost estimation, design changes, material price fluctuations, labor shortages, and unforeseen site conditions. By analyzing these factors within the context of residential construction projects, the study aims to provide a comprehensive understanding of the root causes of cost overruns and their impact on project performance. Furthermore, the research will assess the effectiveness of current cost management practices in the construction industry and explore potential strategies for improving cost estimation, monitoring, and control to minimize the occurrence of cost overruns. The findings of this study are expected to have practical implications for construction professionals, project managers, and stakeholders involved in residential building projects, offering valuable insights into best practices for cost management and risk mitigation in the construction sector. Overall, the project on the assessment of cost overrun causes in construction projects, with a specific focus on residential buildings, represents a significant contribution to the body of knowledge in construction management and aims to address a critical issue that impacts project success and sustainability. By identifying and understanding the factors contributing to cost overruns, this research seeks to inform decision-making processes and facilitate more efficient and cost-effective project delivery in the construction industry.

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Quantity Surveying. 3 min read

Smart Construction Cost Management System Using Building Information Modeling and Re...

What This Project Is About A plain-language overview of how modern tools help manage construction costs by combining building models with live data to forecast ...

BP
Blazingprojects
Read more →
Quantity Surveying. 3 min read

Estimating Accuracy Enhancement in BIM-Driven Cost Planning for Civil Construction P...

What This Project Is About A plain-language overview of BIM-based cost planning and how machine learning can improve cost estimates in civil construction projec...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Impact of Building Information Modeling (BIM) on cost planning and control in large-...

What This Project Is About A practical study on how Building Information Modeling (BIM) helps plan costs and control spending in big infrastructure projects. It...

BP
Blazingprojects
Read more →
Quantity Surveying. 2 min read

Integrated Digital-Takeoff and BIM-Based Cost Estimation for Quantum Construction Pr...

What This Project Is About This project explores how digital tools can streamline construction cost estimation. It combines digital-takeoff, which extracts quan...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Assessing the impact of BIM-enabled quantity surveying workflows on cost predictabil...

What This Project Is About A plain-language overview of the topic and what the project investigates. The Problem It Addresses What problem or gap this project ...

BP
Blazingprojects
Read more →
Quantity Surveying. 2 min read

Assessment of post-contractual cost management in BIM-enabled tendering for resident...

What This Project Is About A plain-language overview of how building projects estimate, control, and manage costs from rough planning to after construction usin...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Assessing the Impact of BIM-Based Quantity Take-Off Accuracy on Cost Predictability ...

What This Project Is About A plain-language overview of how building models and cost planning fit together, focusing on how accurate measurements from digital m...

BP
Blazingprojects
Read more →
Quantity Surveying. 3 min read

Integrated Building Information Modeling (BIM) and Cost Management for Renovation Pr...

What This Project Is About A plain-language overview of how digital modeling (BIM) helps plan, cost, and manage renovations of historic buildings while preservi...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Impact of BIM-enabled quantity take-off accuracy on final project cost and schedule ...

What This Project Is About A plain-language overview of how building information modeling (BIM) helps with counting quantities and how that affects costs and sc...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us