ISSUES AND CHALLENGES IN THE EXECUTION OF PUBLIC SECTOR HOUSING PROJECTS IN NIGERIA

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Research
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Public Sector Housing Projects
  • 2.2Historical Perspective
  • 2.3Theoretical Framework
  • 2.4Factors Affecting Public Sector Housing Projects
  • 2.5Best Practices in Public Sector Housing Projects
  • 2.6Challenges Faced in Public Sector Housing Projects
  • 2.7Impact of Government Policies on Housing Projects
  • 2.8Case Studies on Public Sector Housing Projects
  • 2.9Innovations in Public Sector Housing Projects
  • 2.10Comparative Analysis of Housing Projects

Chapter THREE

SYSTEM DESIGN AND IMPLEMENTATION

  • 3.1Research Methodology Overview
  • 3.2Research Design
  • 3.3Data Collection Methods
  • 3.4Sampling Techniques
  • 3.5Data Analysis Procedures
  • 3.6Ethical Considerations
  • 3.7Research Limitations
  • 3.8Reliability and Validity

Chapter FOUR

SYSTEM TESTING AND EVALUATION

  • 4.1Overview of Research Findings
  • 4.2Analysis of Data
  • 4.3Comparison of Results with Literature Review
  • 4.4Interpretation of Findings
  • 4.5Patterns and Trends in the Data
  • 4.6Discussion on Implications of Findings
  • 4.7Recommendations for Future Research
  • 4.8Practical Applications of Research Findings

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • 5.1Conclusion and Summary of Research
  • 5.2Summary of Findings
  • 5.3Contributions to Knowledge
  • 5.4Implications for Public Sector Housing Projects
  • 5.5Recommendations for Stakeholders
  • 5.6Future Research Directions

Project Abstract

Public sector housing projects in Nigeria face numerous issues and challenges that hinder their successful execution. This research aims to identify and analyze these obstacles to provide valuable insights for improving the delivery of public housing in the country. The study employs a qualitative research approach, utilizing interviews, surveys, and document analysis to gather data from relevant stakeholders in the housing sector. The findings reveal several key issues affecting the execution of public sector housing projects in Nigeria. These include inadequate funding, poor project planning and management, bureaucratic bottlenecks, lack of skilled manpower, corruption, and community resistance. The lack of sustainable financing mechanisms and dependency on government budget allocations contribute significantly to the funding challenges faced by housing projects. Ineffective project planning and management practices often lead to delays, cost overruns, and poor quality in public housing projects. The presence of bureaucratic bottlenecks in the approval processes and procurement procedures further exacerbates these issues, hindering project progress and efficiency. Additionally, the shortage of skilled personnel in the construction industry poses a significant challenge to the successful implementation of housing projects. Corruption remains a pervasive issue in the Nigerian public sector, impacting the transparency and integrity of housing projects. The diversion of funds, kickbacks, and other corrupt practices not only reduce the effectiveness of project implementation but also undermine public trust in government initiatives. Moreover, community resistance, often due to inadequate stakeholder engagement and communication, can stall or even halt housing projects, leading to further delays and increased costs. Addressing these challenges requires a multi-faceted approach that encompasses improved funding mechanisms, enhanced project planning and management practices, streamlining of approval processes, capacity building in the construction industry, and stringent anti-corruption measures. Engaging with local communities and fostering transparency and accountability are also essential for overcoming resistance and ensuring the successful execution of public sector housing projects in Nigeria. By highlighting and analyzing these critical issues, this research contributes to the body of knowledge on public sector housing in Nigeria and offers practical recommendations for policymakers, government agencies, and other stakeholders to address the challenges and improve the delivery of housing projects for the benefit of the Nigerian population.

Project Overview

INTRODUCTION

1.1 BACKGROUND TO THE STUDY Housing (Shelter) is unarguably one of the basic necessities of man. It used to be ranked second after food in the hierarchy of man’s needs but according to Ebie (2009) it is the first and most important of all rights. According to him, because of the importance attached to housing and coupled with the fact that housing in all its ramifications is more than mere shelter, then, execution of public sector housing embraces all social services and utilities that go to make a community or neighbourhood a livable environment, this is now a right in Nigeria. This position is reinforced by section 16(1)(d) of 1999 constitution under the Fundamental Objectives of State Policy which compels the Nigerian State “to provide suitable and adequate shelter for all citizens” Even though this provision is not actionable, it reinforces the call for public sector driven mass housing provision in Nigeria. Housing being a right entails that all strata of a society including the less privileged members of the society, the old, the disadvantaged, the wondering psychotics should own or have access to decent, safe and sanitary housing accommodation at affordable disposal prices or rental with secure tenure.

Unfortunately the reverse is the case as in spite of the policies, institutions and regulations which various Nigerian Governments have put in place since independence; there is still dearth of housing for low income segment. A recent study of housing situation in Nigeria put existing housing stock at 23 per 1000 inhabitant. Housing deficit is put at 15 million housing units (Mabogunje, 2007) while 12 trillion naira will be required to finance the deficit. This is about 4 times the annual budget of Nigeria (FHA, 2007). Housing is of supreme importance to man and one of the best indicators of a person’s standard of living and his place in society. However, at no point has it been adequately supplied either quantitatively or qualitatively (Jiboye 2009; Omoniyi & Jiboye, 2011). Over time, the need for adequate shelter has continued to attract global attention especially in developing countries where the urbanization process has been growing at an alarming rate. The phenomenal rise in population, increase in number and size of most cities in the past decades have led to acute shortage of adequate dwelling units in many urban centres globally (Jiboye, 2009).

Consequently, in recent time, the issue of housing has formed part of the major discussion in several global summits such as the 1992 Rio-de Janeiro summit on environment and development, the 1996 Habitat summit at Istanbul, the 2000 New York, United Nations Millennium Development Goals (MDGS) summit, 2002 World Summit in Johannesburg and the 2005 La Havana, UN sustainable Cities Documentation of Experience Programme (Oladunjoye, 2005; UN-Habitat, 2007; UNDPI, 2008).

Nigeria, like other developing countries is saddled with uncontrollable growth of the urban population caused by lack of provision of infrastructural facilities and poor economic conditions in the rural areas. The proportion of the Nigerian population living in urban centres has increased phenomenally from 7% in the 1930s, 10% in 1950, 20% in 1970, 27% in 1980 to 35% in 1990 (Okupe, 2002). Over 40% of Nigerians now live in urban centres of varying sizes. The incidence of this population in urban centres has created severe housing problems, resulting in overcrowding in inadequate dwellings, and in a situation in which 60% of Nigerians can be said to be “houseless persons” (Federal Government of Nigeria, 2004).

Besides the incidence of overcrowding in the existing housing stock, rural-urban drift has occasioned the sprouting of make shift dwellings or squatter settlements in cities that are devoid of minimum structural and normative quality. Majority of the houses are constructed with all sorts of refuse/second-hand materials in illegally occupied self allocated land, they are badly maintained and lack the basic necessities of life like sanitary facilities, light, air and privacy. As evidenced by past researches in housing studies, most urban centres in the country are characterized by high density buildings, acute sanitary problems, pollution of air, surface water, noise and solid wastes (Filani, 1987, Agbola, 1998). According to Olotuah (2002) estimated 2.3 million urban dwelling units are substandard, only 33% of urban houses can be considered to be physically sound, and 44% and 19% require minor and major repairs respectively to bring them to normative and structural quality. Despite all efforts of the government at achieving sustained housing delivery to the common people, existing realities indicate the goal is far from being achieved. It is against this background that this research examines the major issues and challenges of execution of public sector housing in Nigeria with a view to stimulating relevant agencies of government and other stakeholders into designing appropriate strategies for effective execution of public sector housing in Nigeria.

1.2 STATEMENT OF THE PROBLEM In many developing countries, including Nigeria, urban housing crisis is escalating unabated despite a number of new policies, programs and strategies being engaged in by public and private sectors aimed at execution of public sector housing in addressing this problem (Okupe, 2002). Since execution of public sector housing is principally carried out by government agencies and their collaborators, the researcher argues that one vital step to addressing myriads of issues and challenges in execution of public sector housing in Nigeria is to identify areas of weakness in public housing agencies and subsequently address such weakness for enhanced productivity (Jiboye, 2009). It is for this reason that the study investigated the contextual and organizational challenges related to execution of public sector housing in Nigeria in the post independence era.

This study attempted at using key organizational components to assess areas of challenges in execution of public sector housing among government agencies in the study area. This is with a view to assisting public-sector housing policy makers and program managers chart future pathways for improved performance in public housing provision and management in Nigeria.

1.3 OBJECTIVES OF THE STUDY The general objective of this research is to analyze the issues and challenges in the execution of public sector housing in Nigeria while the following are the specific objectives:

To examine the challenges of execution of public sector housing in Nigeria.
To ascertain the factors causing housing challenges in Nigeria.
To determine the solution to the issues of execution of public sector housing in Nigeria.
1.4 RESEARCH QUESTIONS

What are the issues and challenges in execution of public sector housing in Nigeria?
What are the factors causing housing challenges in Nigeria?
What are the solutions to the issues of execution of public sector housing in Nigeria?
1.6 SIGNIFICANCE OF THE STUDY The following are the significance of this study:

Outcome of this study will educate stakeholders in housing development and the general public on the issues and challenges of execution of public sector housing in Nigeria thereby making the study very useful as a guide to policy makers in government. This will however helped in better housing development policy adoption and implementation.
This study will also assist public-sector housing policy makers and program managers to chart future pathways for improved performance in execution of public sector housing and management in Nigeria.
This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied, it will go to an extent to provide new explanation to the topic.
1.7 SCOPE/LIMITATIONS OF THE STUDY This study on issues and challenges in the execution of public sector housing project in Nigeria will cover the major issues on poor housing development in Nigeria with a view to determine a strategic framework for massive execution of public sector housing projects in Nigeria. LIMITATION OF STUDY Financial constraint– Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview). Time constraint– The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work. 1.8 DEFINITION OF TERMS Housing: Buildings or structures that individuals and their family may live in that meet certain federal regulations. Different housing situations vary for individuals and may depend on age, family, and geographic location. For example, a recent university graduate in an urban environment in the US may live in a rented apartment whereas a middle-aged entrepreneur may live in a house with or without a mortgage. Public: of or concerning the people as a whole. Population: all the inhabitants of a particular place. Migration: Movement of people to a new area or country in order to find work or better living conditions: the extensive rural-to-urban migration has created a severe housing problems.

REFERENCES Agbola, S.B. (1998) The housing of Nigerians – A review of policy development and implementation. Research Reports No. 14 Ibadan, Nigeria: Development Policy Centre. Ebie, S.P.O.F.(2009, May). Public sector driven housing; achievements and problems. Paper presented at the 2009 Faculty of Environmental Sciences Annual lecture, Nnamdi Azikiwe University, Awka. Federal Government of Nigeria (2004) National Housing Policy Draft, Abuja. Federal Republic of Nigeria (1999) Constitution 10 Jiboye, A.D (2009). The challenges of sustainable housing and urban development in Nigeria. Journal of Environmental Research and Policies 4(3), 23-27 Okupe, L (2002) Private sector initiative in housing development in Nigeria – How feasible? Housing Today, 1(6), 21-26 OladunJoye, A. O. (2005). Implementation of the sustainable cities programme in Nigeria. Havana 2005 – Documentation of experience SCP.LA21. Sustainable cities programme. Locating Agenda 21 Programme. Olotuoh, A.O. & Ajemifujah, A.O. (2009). Architectural education and housing provision in Nigeria. CEBE Transactions 6(1), 86-102. Retrieved from http://www.cebe.heacademy.ac.uk/transactions /pdf/ olotuahajemifujah6 (1) p.d.f. Omoniyi, S & Jiboye, A.D (2011). Effective housing policy and sustainable development in Nigeria. International Journal of Development Studies. 6(1), 129-135 UN-Habitat, (2007) Milestones in the Evolution of Human Settlement Policies. 1976-2006. State of the World Cities. Report 2006/2007. The MDGS and Urban Sustainability. 30 years of Shaping the Habitat Agenda. Earsthean United Nations Development of Public Information (UNDPI) (2008). Achieving the Millennium Development Goals in Africa. Recommendations of the MDG steering group. Retrieved from http://www.indgafrica.org.pdf.

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Civil engineering. 3 min read

Optimization of Fly Ash–Geopolymer Concrete for Sustainable Structural Application...

What This Project Is About A practical study of using fly ash–geopolymer concrete to build safer, more sustainable structures that perform well during earthqu...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

- Assessment of Seismic Retrofit Strategies for Existing Reinforced Concrete Buildin...

What This Project Is About A final-year project exploring how existing reinforced concrete buildings in areas prone to strong earthquakes can be made safer, how...

BP
Blazingprojects
Read more →
Civil engineering. 3 min read

Seismic Retrofit and Performance Evaluation of Low-Cost Housing Using Recycled Polyp...

What This Project Is About A plain-language overview of the topic and what the project investigates. The Problem It Addresses What problem or gap this project ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Life-Cycle Assessment and Optimization of Lightweight Sustainable Concrete for Seism...

What This Project Is About A plain-language overview of the topic and what the project investigates. The Problem It Addresses What problem or gap this project ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Advanced seismic retrofit design of existing reinforced concrete frame buildings usi...

What This Project Is About A straightforward, beginner-friendly overview of upgrading existing concrete frame buildings to perform better during earthquakes. Th...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Sustainable Urban Stormwater Management Using Permeable Pavements and Green Roofs: A...

What This Project Is About A plain-language overview of how cities can manage rainwater by using two green infrastructure ideas: permeable pavements, which let ...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Optimization of Submerged Floating Tunnel (SFT) Deployment for Offshore Civil Infras...

What This Project Is About A plain-language overview of the topic and what the project investigates. The Problem It Addresses What problem or gap this project ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Seismic Retrofitting of RCC Frame Structures Using Fiber-Reinforced Polymer Wraps an...

What This Project Is About A straightforward study on ways to strengthen concrete buildings (RCC frames) to better withstand earthquakes. It looks at two approa...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Integrated sustainable flood-resilient urban drainage system for peri-urban areas: d...

What This Project Is About A plain-language overview of the topic and what the project investigates. The Problem It Addresses What problem or gap this project ...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us