<p>
</p><p><strong>
Chapter ONE
</strong></p><p>1.0 Introduction </p><p>
Chapter TWO
</p><p>2.0 Literature Review </p><p>
Chapter THREE
</p><p>3.0 Theory of Construction and Analysis </p><p>3.1 Component Pasts of the Refrigerator </p><p>3.2 Theory of Reversed Heal Engineering System</p><p>Operating on A Cannot Cycle </p><p>3.3 Refrigerant </p><p>3.4 The Construction Standards and</p><p>Component Determination </p><p>
Chapter FOUR
</p><p>4.0 Construction Procedures </p><p>4.1 Material Selection </p><p>4.2 Tools /Equipment Used </p><p>4.3 Construction Method and</p><p>Procedure (Sequence of Operation </p><p>4.4 Laying of Evaporator Ripe (Piping </p><p>4.5 Lagging </p><p>4.6 Electrical System in the Fridge </p><p>4.7 Principles of Operation </p><p>
Chapter FIVE
</p><p>5.0 Testing and Evolution </p><p>CHAPTER SIX</p><p>Cost Analysis </p><p>6.0 Material Cost </p><p>6.2 Labour Cost Recommendation </p><p>References </p>
<br><p></p>