Home / Environmental management / The effects of construction delays on projects delivery in nigeria

The effects of construction delays on projects delivery in nigeria

 

Table Of Contents


<p> Cover Page – – – – – – – – – –<br>Title Page – – – – – – – – – –<br>Certification – – – – – – – – – –<br>Dedication – – – – – – – – – –<br>Acknowledgement – – – – – – – – –<br>Abstract – – – – – – – – – –<br>Table of Content – – – – – – – – –<br><strong>

Chapter ONE

: Introduction</strong><br>Background of the Study – – – – – –<br>Statement of the Problem – – – – – –<br>Objectives of the Study – – – – – – –<br>Research Questions – – – – – – –<br>Research Hypotheses – – – – – – –<br>Significance of the Study – – – – – – –<br>Scope/ Limitation of the Study – – – – – –<br>Definition of Terms – – – – – – –<br><strong>

Chapter TWO

: Review of Related Literature</strong><br>2.1 Introduction – – – – – – – – –<br>2.2 Conceptual Framework – – – – – – –<br>2.3 Theoretical Framework – – – – – – –<br>2.4 Empirical Review – – – – – – – – <strong>

Chapter THREE

: Research Methodology</strong><br>3.1 Introduction – – – – – – – –<br>3.1 Research Design – – – – – – – –<br>3.3 Area of the Study – – – – – – – –<br>3.4 Population of the Study – – – – – – –<br>3.5 Sample Size and Sampling Techniques – – – –<br>3.6 Instrumentation – – – – – – – –<br>3.7 Validation of the Instrument – – – – – –<br>3.8 Administration of the Instrument – – – – –<br>3.9 Method of Data Analysis – – – – – – – <strong>

Chapter FOUR

: Presentation, Analysis and Interpretation of Data</strong><br>4.1 Introduction – – – – – – – – –<br>4.2 Presentation and Analysis of Data – – – – –<br>4.3 Testing of Hypotheses – – – – – – –<br>4.4 Discussion of Findings – – – – – – –<br><strong>

Chapter FIVE

: Summary, Conclusion and Recommendations</strong><br>5.1 Introduction – – – – – – – – –<br>5.2 Summary – – – – – – – – –<br>5.3 Conclusion – – – – – – – – – &nbsp; &nbsp; &nbsp; <br></p>

Project Abstract

<p> Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays. <br></p>

Project Overview

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Environmental manage. 2 min read

Assessment of the effectiveness of plastic waste management strategies in reducing e...

The project topic "Assessment of the effectiveness of plastic waste management strategies in reducing environmental pollution" focuses on evaluating t...

BP
Blazingprojects
Read more →
Environmental manage. 4 min read

Assessment of Sustainable Waste Management Practices in Urban Areas: A Case Study of...

The project titled "Assessment of Sustainable Waste Management Practices in Urban Areas: A Case Study of City XYZ" focuses on investigating and evalua...

BP
Blazingprojects
Read more →
Environmental manage. 3 min read

Assessment of the effectiveness of sustainable waste management practices in urban a...

The project titled "Assessment of the effectiveness of sustainable waste management practices in urban areas" aims to investigate and evaluate the eff...

BP
Blazingprojects
Read more →
Environmental manage. 3 min read

Assessment of Plastic Waste Management Strategies in Urban Areas...

The project topic "Assessment of Plastic Waste Management Strategies in Urban Areas" focuses on investigating and evaluating the effectiveness of vari...

BP
Blazingprojects
Read more →
Environmental manage. 2 min read

Assessment of Green Infrastructure Practices for Urban Stormwater Management....

The project on "Assessment of Green Infrastructure Practices for Urban Stormwater Management" aims to investigate and evaluate the effectiveness of ut...

BP
Blazingprojects
Read more →
Environmental manage. 4 min read

Assessment of Sustainable Waste Management Strategies in Urban Areas...

The project topic "Assessment of Sustainable Waste Management Strategies in Urban Areas" aims to investigate and evaluate the effectiveness of various...

BP
Blazingprojects
Read more →
Environmental manage. 3 min read

Assessment of the Impact of Climate Change on Coastal Ecosystems and Strategies for ...

The project titled "Assessment of the Impact of Climate Change on Coastal Ecosystems and Strategies for Sustainable Management" focuses on investigati...

BP
Blazingprojects
Read more →
Environmental manage. 2 min read

Assessment of Water Quality and Ecosystem Health in a Urban River Basin...

The project "Assessment of Water Quality and Ecosystem Health in an Urban River Basin" aims to investigate and evaluate the current state of water qua...

BP
Blazingprojects
Read more →
Environmental manage. 2 min read

Innovative Approaches for Sustainable Waste Management in Urban Areas...

The project on "Innovative Approaches for Sustainable Waste Management in Urban Areas" aims to address the pressing issue of waste management in urban...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us