Design and construction of an automatic change-over switch with generator cut off and starter

 

Table Of Contents


Project Abstract

Abstract
This research project focuses on the design and construction of an automatic change-over switch with generator cut off and starter. The main objective of this project is to develop a reliable and efficient system that can automatically switch between the main power supply and a backup generator while ensuring a smooth transition without any interruptions. The system is designed to monitor the main power supply and automatically start the generator when a power outage is detected. It also includes a feature to cut off the generator when the main power supply is restored. The design incorporates safety features to prevent any damage to the electrical system and ensure the protection of connected appliances. The automatic change-over switch is implemented using microcontroller-based control logic for accurate and reliable operation. The system includes sensors to detect the status of the main power supply and the generator, allowing for seamless switching between the two power sources. Additionally, the system is equipped with overload protection and voltage regulation mechanisms to safeguard the electrical components and ensure stable power supply to the connected loads. The construction of the automatic change-over switch involves assembling the necessary components such as relays, contactors, sensors, and a microcontroller on a suitable control panel. The wiring connections are carefully laid out to ensure proper communication between the components and facilitate the switching process. Extensive testing is conducted to validate the functionality and performance of the system under various operating conditions. The automatic change-over switch with generator cut off and starter offers a practical solution for managing power outages and ensuring continuous power supply to critical loads. The system provides convenience and peace of mind to users by automating the process of switching between power sources and protecting the electrical system from potential hazards. The design and construction of this system demonstrate the application of modern control technology in improving the reliability and efficiency of power distribution systems. Future enhancements could include remote monitoring and control capabilities to further enhance the functionality and usability of the system.

Project Overview

INTRODUCTION

1.1             Background of The project

The increase rate of epileptic power supply especially in tropical African countries where Nigeria forms a part has become a major concern. The power supply instability in developing countries creates a need to device means for alternative power sources. The automation of electrical power generation or alternative sources of power to back up the utility supply could lead to power stability. This automation becomes necessary as the rate of power outage becomes predominantly high. The residence, commercial and industries dependent on generators and public power change-over between these two power supplying sources are manual, human error during change-over connections may occur; leading to machine damage, electric shock/electrocution as well as increased down time consequently introducing massive losses (Mazur and Rocks, 2010). However, when automation takes place between the mains supply and generator it will automatically switch from mains to the generator when there is power failure by starting generator and cut off the generator switching to the mains when there is public power. This help to reduce down time thereby maintaining constant power supply.

1.2        Statement of the Problem

Nowadays securing constant power supply is becoming more important. In Nigeria, power supply for domestic use, commercial and industries is highly unstable. The applications of alternative sources are associated with challenge of switching smoothly and timely between the mains supply and the alternative sources whenever there is power failure on the mains source. The use of an automatic changeover switch with generator cut off and starter eliminate the stress encountered when switching from mains supply to generator Vis visa and reduce time loss for increase productivity.

1.3     Aim and Objectives

This project focuses on the design and construction of an automatic change-over switch with generator cut off and starter.

Hence, the specific objectives are as follow;

1.  To provide a system that automatically switches on the generator and switch over the load to the generator whenever there is mains power failure.

2.  To provide a device that automatically switches over to mains supply once restored and simultaneously switches off the generator.

1.4     Scope of the Study

The scope of this project is centered the on the design and construction of a change-over switch with cut off and starter of a generator with a capacity of 3.5 KVA.

The project is designed for power supply applications. It involves automatic changeover between the main power supply and an auxiliary power supply, such as a generator. The project implements an automatic switching or starting of the power generator whenever the main power fails.

1.5     Limitation of the Study

The automatic changeover switch with generator cut off and starter does not function with a faulty generating set.

It does not function with generators that have a manual starter which is a sine quo non to the function of the automatic change-over.

1.6 Significance of the Study

The significance of this work cannot be overemphasized. Therefore, benefits that are associated to the change-over switch are;

1.  It minimizes damages to lives and equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.

2.  It reduces change-over time to a minimum, due to its fast response to power restoration.

3.  It maintains high quality of service through its fast and prompt response.

4.  Moreover, the unit is portable, easy, convenient and safe to install.


Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Electrical electroni. 3 min read

Design and Implementation of an Intelligent Energy Management System for Smart Grid ...

The project topic "Design and Implementation of an Intelligent Energy Management System for Smart Grid Applications" focuses on the development and de...

BP
Blazingprojects
Read more →
Electrical electroni. 2 min read

Design and Implementation of Smart Home Energy Management System using IoT Technolog...

The project on "Design and Implementation of Smart Home Energy Management System using IoT Technology" aims to develop a cutting-edge system that leve...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and Implementation of a Smart Energy Management System for Residential Buildi...

The project topic "Design and Implementation of a Smart Energy Management System for Residential Buildings" focuses on the development and application...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of an IoT-based smart energy management system for residen...

The project "Design and Implementation of an IoT-Based Smart Energy Management System for Residential Buildings" aims to address the growing need for ...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of a smart grid system for optimizing energy distribution ...

The project on "Design and implementation of a smart grid system for optimizing energy distribution and management" aims to address the pressing need ...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and Implementation of an Energy-Efficient Smart Home System using Internet of...

The project, "Design and Implementation of an Energy-Efficient Smart Home System using Internet of Things (IoT) Technology," aims to revolutionize res...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and Implementation of a Smart Grid System for Efficient Energy Management...

The project topic, "Design and Implementation of a Smart Grid System for Efficient Energy Management," focuses on developing a smart grid system to en...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of a smart energy management system for residential buildi...

The project on "Design and Implementation of a Smart Energy Management System for Residential Buildings using Internet of Things (IoT) Technology" aim...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and Implementation of Smart Grid Technology for Efficient Energy Management...

The project titled "Design and Implementation of Smart Grid Technology for Efficient Energy Management" aims to explore the integration of smart grid ...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us