1.0 INTRODUCTION
Management of prisons in Nigeria has long
been a neglected area which has recently been incorporated in the
e-governance program of Government of Nigeria. Currently a rudimentary
process of storing all the prisoner data in manual files and registers
is in place. The Prison Management System project will integrate all the
prisoner data into a single integrated system which will in turn result
all the information being present in a digital format.
ICT in prisons was initiated in the year
2002 at Delhi Prisons, Tihar. The Tihar Prisons Complex in New Delhi is
the biggest prison complex in Asia comprising of 9 prisons and one
District Jail at Rohini with a total strength of more than 11,000
prisoners against a normal sanctioned capacity of 6250 prisoners. In a
year about 70,000 - 80,000 inmates remain lodged in these prisons for
different duration and crimes committed by them. This prison population
has about 80% under trials and includes about 480 women inmates. About
400 inmates are foreigners from different parts of the world. Many high
security criminals also live here. There has been a substantial increase
in number of prison inmates coming to Tihar because of a phenomenal
increase in the crime scene at Delhi that has resulted in the increase
of the ICT needs and its management at the Tihar Jail Complex.
Nearly 1700-1800 visitors meet their
relative inmates’ everyday. There was manual system of booking
(meetings) in each jail for its respective inmates. Centralised visitor
record was not available. There was lack of exchange of visitors’
information within jails and prison headquarters. No provision for
identification / detection / verification of visitors was there.
Managing the prisoner record and
monitoring of prisoner / visitor was always difficult since most of the
records were normally maintained manually, so the concerned authorities
were required to go through all the registers to find out the details
and status of the inmate as well as of the visitor.
In order to cope up with the increasing
number of prisoners being lodged in, the Tihar Administration required a
re-engineering and rationalization of their key business processes and
functions of prisoners’ related information and their computerization in
order to speed up the processing of information need of courts and
various other national agencies.
As the technology evolution is taking
place, there arose a need for centralization of prisoner’s data to
facilitate information exchange and data sharing to the users of the
prison. It shall reduce administrative overheads, speed up
responsiveness to users, reduce risks involved in inmate’s custody,
eliminated obsolete processes and reap cost-cutting benefits.
- 2 STATEMENT OF PROBLEM
Management of prison’s in Nigeria is still
at a nascent stage and follows rudimentary processes. Most of the
prisons in Nigeria have a collection of manual files and registers to
store prisoner/criminal records. This is a very inefficient and
cumbersome way of storing records which greatly impedes the flow of
critical information as well as makes looking up of information time
consuming. Also, different files and registers are required to store the
information which is relevant to a single prisoner. This hinders the
profiling process of prisoners.
1.3 OBJECTIVE OF THE PROJECT
The main purpose behind the implementation
of the Prison Management System (PMS) was to enhance the administrative
capabilities of the jails in terms of monitoring and security of the
prison while improving the efficiency and productivity of the Prisons.
The main goals of the project are enunciated below:
- To ensure proper monitoring of the prisons by the top officials
- To ensure that the discipline and decorum of the jails is maintained by both the employees and the prisoners
- To ensure that no impersonation of the prisoners happens by proper validation and authentication of the prisoner’s identity
- To improve the productivity and efficiency of the prisons so as to
facilitate the usage of the available work force for sensitive work
while leveraging technology to reduce the mundane workload of the
employees
- To ensure the availability of data in digital form for preservation, analysis and reporting.
- 4 SIGNIFICANCE OF THE PROJECT
The nature of project is such that outcome
of project could be quantitatively measured only for few parameters
such as Automatic detection of duplication
Immediate generation of report on categorization of prisoners on basis of their cases, period of confinement etc.
- Automatic calculation of Remission to be granted to a convict prisoner for good behavior, discipline etc.
- Reduction in the cost (Saving of resources) of physical production of prisoners in Courts.
1.5 SCOPE OF THE PROJECT
The basic purpose of this project is to
develop an online system for prison management. The system developed
covers prisoner’s information such as picture, conviction, offence,
visitors, address, jail term record etc.
1.6 PROJECT REPORT ORGANIZATION
The project is organized as follows;-
Chapter one introduces the background of
the project with the statement of the problems, objectives of the
project, its significance, scope, and constraints are pointed out.
Previous literatures on prison management information system were
reviewed in Chapter two. Chapter three discusses system Investigation
and Analysis. It deals with detailed investigation and analysis of the
existing system and problem identification. It also proposed for the new
system. Chapter four covers the system design and implementation.
Chapter five was the summary and conclusion of the project.
- 7 DEFINITION OF TERMS
Data- This can be defined as facts about the organization and its business transaction.
Information- This can be defined as data that has been transformed and organized byprocessing and purposeful intelligence.
Information system- This
is an arrangement of people, data, processes and interface that interact
to support and improve day to day operation in a business as well as
support the problem solving and decision making needs for management and
users.
Management: It is the
co-ordination of all the resources of an organization through the
process of planning, organization, directing and controlling in order to
attain organizational objectives.
ndon: Pearson Education Limited.