Home / Civil engineering / THE IMPACT OF EFFECTIVE CONTRACT PLANNING ON CONTRACTORS PROFIT (A CASE STUDY OF JULIUS BERGER NIGERIA PLC, UYO)

THE IMPACT OF EFFECTIVE CONTRACT PLANNING ON CONTRACTORS PROFIT (A CASE STUDY OF JULIUS BERGER NIGERIA PLC, UYO)

 

Table Of Contents


Chapter ONE

1.1 Introduction
1.2 Background of Study
1.3 Problem Statement
1.4 Objectives of Study
1.5 Limitation of Study
1.6 Scope of Study
1.7 Significance of Study
1.8 Structure of the Research
1.9 Definition of Terms

Chapter TWO

2.1 Overview of Contract Planning
2.2 Importance of Effective Contract Planning
2.3 Factors Influencing Contract Planning
2.4 Best Practices in Contract Planning
2.5 Challenges in Contract Planning
2.6 Relationship between Contract Planning and Contractors' Profit
2.7 Case Studies on Contract Planning Success
2.8 Case Studies on Contract Planning Failures
2.9 Future Trends in Contract Planning
2.10 Summary of Literature Review

Chapter THREE

3.1 Research Methodology Overview
3.2 Research Design and Approach
3.3 Data Collection Methods
3.4 Sampling Techniques
3.5 Data Analysis Procedures
3.6 Ethical Considerations
3.7 Validity and Reliability
3.8 Limitations of the Research Methodology

Chapter FOUR

4.1 Data Presentation and Analysis
4.2 Overview of Participants
4.3 Findings on Contract Planning Practices
4.4 Relationship between Contract Planning and Profit
4.5 Statistical Analysis Results
4.6 Discussion on Key Findings
4.7 Implications of Findings
4.8 Recommendations for Contractors

Chapter FIVE

5.1 Conclusion and Summary
5.2 Summary of Findings
5.3 Achievements of Objectives
5.4 Contribution to Knowledge
5.5 Practical Implications
5.6 Recommendations for Future Research
5.7 Conclusion Remarks

Project Abstract

Abstract
Effective contract planning plays a crucial role in the profitability of contractors in the construction industry. This research project focuses on investigating the impact of effective contract planning on the profitability of Julius Berger Nigeria PLC, Uyo branch. The study employs a case study approach to gain an in-depth understanding of how contract planning practices influence the financial performance of the company. The research utilizes both primary and secondary data sources to gather comprehensive information on the subject matter. Primary data is collected through interviews with key personnel involved in contract planning at Julius Berger Nigeria PLC, Uyo. Secondary data is obtained from relevant literature, company reports, and industry publications to support the findings. The findings of the study reveal that effective contract planning has a significant positive impact on the profitability of contractors. Through meticulous planning of project timelines, resource allocation, risk management, and cost estimation, contractors can enhance their efficiency and reduce potential financial losses. In the case of Julius Berger Nigeria PLC, Uyo, the implementation of robust contract planning strategies has contributed to improved project outcomes and increased profitability. Furthermore, the research identifies key factors that contribute to effective contract planning, such as skilled personnel, use of technology, stakeholder collaboration, and adherence to industry best practices. By focusing on these factors, contractors can optimize their project execution processes and achieve better financial results. In conclusion, the study underscores the importance of effective contract planning in enhancing contractors' profitability in the construction industry. The findings provide valuable insights for contractors, project managers, and stakeholders seeking to improve their financial performance through enhanced planning practices. By investing in robust contract planning strategies and leveraging available resources efficiently, contractors can mitigate risks, improve project delivery, and ultimately increase their profitability. Overall, this research project contributes to the existing body of knowledge on contract planning in the construction industry and offers practical recommendations for contractors looking to enhance their financial performance through effective planning practices.

Project Overview

INTRODUCTION1.1 BACKGROUND OF THE STUDY AND ORGANIZATIONAL PROFILESeeley (1997) described the construction industry as one of the most important sectors of the economy, which integrates a wide variety of skilled and unskilled professionals. These professionals engage in the provision of goods and services ranging from construction, alteration, refurbishment to repairs of building and civil engineering structures. All these professionals work together under various types of contractual agreements to actualize the client’s brief and deliver the project. Contractors ProfitEach project is unique and has its main objectives outlined by the client and project circumstances. Amongst the most common objectives of any successful project are deliveries at the right time, within authorized cost and meeting the envisaged quality standards (Love et al, 1998).Construction projects, like all others, are not risks free and thereby can result to financial loss. Construction risks are events that generally influence any or all of the project objectives. Risk events could either be positive in terms of opportunities or negative in terms of threats to either or the entire project objectives (Hillson, 2002).A lot of academic and professional literature has developed in the field of effective contract planning and management within construction contexts. The degree of application of contract planning and management techniques by contractors especially, was found to differ in various construction industries across the globe. Most countries in the MiddleEast and some part of Africa do not utilize project planning and management techniques in the delivery of construction projects (El-Sayegh, 2008; Laryea and Hughes,2009). Akintoye and McLeod (1997) found that low usage of formal contract planning techniques was essentially due to lack of knowledge and doubts on the suitability of the techniques to real life situations. This was supported by the findings of Shen (1997). Kartam and Kartam (2001) however attributed the low usage of risk analysis techniques to subjective judgement and contractor’s reliance on their experience and intuition. El-Sayegh (2008) identified financial loss as the most significant in the Kuwaiti construction industry due to the boom in construction activities and inflationary trend of the market.Laryea and Hughes (2009) attempted to find how contractors’ in Ghana include financial risk in their bid prices. The research showed that besides having risk allowances as lump sums or percentage allowances, the method used is neither scientific nor informed by any empirical evidence. Ojo (2010) found that design changes, financial losses and inadequate specifications were the risk factors with most impacts on construction sites but the study did not highlight any Project contract planning (PRM) technique used by Contractors to respond to such risks.Another research carried out in Nigeria on this subject was on the evaluation of key risk factors and the measures to mitigate their effects on construction projects (Dada, 2010). Though the research found financial, political and physical risks as the most significant, the use of contingency sum and insurance cover were adjudged to be the most effective means of mitigating risk. Contractors ProfitHowever, no study has reported on the PRM practices used by Nigerian Contractors in redevelopments projects, with their attendant problems and challenges in terms of scoping. Contractors Profit1.1.2 ORGANIZATIONAL PROFILEJulius Berger Nigeria Plc is a Nigerian construction company, headquartered in Abuja FCT, with additional permanent locations in Lagos and Uyo.The company is represented across Nigeria in structural engineering and infrastructure works, and in southern Nigeria through domestic and international oil and gas industry projects (this company is also listed on the -flake list” for craigslist). It is known for constructing most of Nigeria’s infrastructures, major expressways, and even some residential buildings for the Chevron Nigeria headquarters in Lagos. Contractors ProfitThe company was listed on the Nigerian Stock Exchange in 1991. Before this, its parent company was Bilfinger Berger. Bilfinger Berger is still the largest shareholder in the company. The construction business of Julius Berger Nigeria is the heart of the Julius Berger Group. Contractors ProfitWith 18,000 employees from close to 40 nations and clients from both Nigeria and the global oil and gas industry, JB is a leading construction company and the largest private employer in Nigeria.MAJOR PROJECTSThe company built the Eko Bridge completed in 1968, the Third Mainland Bridge completed in 1990 and the Abuja Stadium completed in 2003.Tin Can Island Port, commissioned in 1977.Lagos Inner Ring Road, completed in 1979.Ajaokuta Steel Plant, completed in 1990.Itakpe - Ajaokuta Ore Railway, completed in 1990.Abuja International Airport phase II, completed in 1997.Central Bank of Nigeria Head Office, completed in 2002.Uyo infrastructure and road works, ongoing since 2008.First discharge drain built utilizing pipe-jacking technology in Nigeria, completed in 2011.National Assembly phase III, completed in 2011.Multiple projects, Escravos GTL plant in southern Nigeria, commissioned in 2012.Bonny Liquefied Natural Gas facility, multiple ongoing works since 1996.Challawa Gorge Dam Karaye, completed in 19921.2 PROBLEM STATEMENTThe general low usage of formal contract planning and management techniques by Contractors globally often culminates into project failures, incessant claims for variations, huge financial losses and sometimes results in bankruptcy of Contractors (Allan et al, 2007). This situation is more prevalent in redevelopment projects due to the inevitable problems of unexpected additional work, excessive requirements and scope management issues, project funding not aligned with project plans, delay, structural failure, cost overrun, etc (Naaranoja and Uden, 2007). These problems or uncertainties, among others, increase the project risk and make their management crucial if success is desired.For the Eket-Ona 20km dual road project, billions of Naira was expended and the overall aim of the project was not achieved. This huge expenditure and apparent failure in the primary objectives of the project led to complaints, probe panels and subsequent abandonment of the project.Research has shown that financial, political and physical risks are the most significant to Nigerian Contractors (Dada, 2010). However, of the different levels of risk (country, market or project), there is shortage of research as to how Contractors approach project planning at organisational level.1.3 RESEARCH OBJECTIVESTo explore contract planning practices applied by Julius Berger at various project levels.To assess awareness and usage of formal and informal contract planning practices by Julius Berger, Uyo office.To examine the success or failure of the contract planning approach used by Julius Berger Contractors on Eket-Ona dual road project.To evaluate the impact of the applied contract planning approach to the attainment of project profits.1.4 RESEARCH QUESTIONSWhat contract planning guidelines and practices exist in Julius Berger Nigeria Plc, Uyo?How do you gather information about newer contract planning strategies to be applied in your on-going projects?What are the effects of contract planning on contractor’s profit?1.5 HYPOTHESIS FORMULATIONHypothesis for this study include:Ho:There is no significant relationship between effective contract planning and contractor’s profit.Hi: There is significant relationship between effective planning and contractor’s profit.1.5 SIGNIFICANCE OF THE STUDYThis study gives a clear insight into the various ways in which contractors in the construction companies in Nigeria can maximize profits through effective and efficient contract planning and management. The study also gives a clear insight into the various effects of contract planning on risk level, cost and timing of a project. The findings and recommendations of the researcher will help in building a strong and better contract policy and guideline in Julius Berger Nigeria Plc as well as other construction companies in Nigeria, if taken seriously by government and the general public. The effects of contract planning on cost and time are outlined in-order for drastic measures to be taken to tackle any challenge employers may face when developing and implementing contracts with other organizations.1.6 SCOPE OF STUDYThis research focuses mainly on the impact of effective contract planning on contractor’s profit in Julius Berger Nigeria Plc, Uyo. Results and recommendations may not be used to generalize other construction companies in Nigeria, as the researcher could not cover a wider scope due to financial and time constraints.Based on the findings of this study other possible researchable areas may include studies on the various effects of other aspects of contracts such as contract laws in Nigeria and contract management and control1.7 LIMITATION OF THE STUDYThe only limitation faced by the researcher in the course of carrying out this study was the delay in getting data from the various respondents. Most respondents were reluctant in filling questionnaires administered to them due to their busy schedules and nature of their work. The researcher found it difficult to collect responses from the various respondents, and this almost hampered the success of this study.1.8 DEFINITION OF TERMSDefinitions of terms serve as the dictionary of this research. The terms are defined to enable the reader understand the research more clearly.Contract: Erikson (2002) defined Contract as an agreement that creates an obligation binding upon the parties thereto. The essentials of a contract are as follows: (1) mutual assent; (2) a legal consideration, which in most instances need not be pecuniary; (3) parties who have legal capacity to make a contract; (4) absence of fraud or duress; and (5) a subject matter that is not illegal or against public policy. Contractors ProfitContract Planning: According to Simmons (2007),Contract planning is the process of systematically and efficiently managing contract creation, execution and analysis for maximizing operational and financial performance and minimizing risk. Contractors ProfitContractor: General contractor, organization or individual that contracts with another organization or individual (the owner) for the construction of a building, road or other facility. Contractors ProfitProfit: Tucy (2008) defined profit as the difference between the purchase price and the costs of bringing to market.

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Civil engineering. 4 min read

Design and Analysis of a Sustainable High-rise Building Using Green Construction Tec...

The project topic "Design and Analysis of a Sustainable High-rise Building Using Green Construction Techniques" focuses on the innovative approach of ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Analysis and Design of Sustainable Green Building Structures using Bamboo as a Prima...

The project on "Analysis and Design of Sustainable Green Building Structures using Bamboo as a Primary Material" aims to explore the feasibility and b...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Analysis and design of a sustainable stormwater management system for urban areas....

The project topic, "Analysis and design of a sustainable stormwater management system for urban areas," addresses the critical need for effective stor...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Optimization of Reinforced Concrete Bridge Design for Enhanced Durability...

The project topic "Optimization of Reinforced Concrete Bridge Design for Enhanced Durability" focuses on improving the longevity and resilience of rei...

BP
Blazingprojects
Read more →
Civil engineering. 3 min read

Optimization of Reinforced Concrete Structures Using Advanced Computational Tools...

The project on "Optimization of Reinforced Concrete Structures Using Advanced Computational Tools" aims to enhance the design and analysis process of ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Design and Analysis of a Sustainable Urban Drainage System...

The project on "Design and Analysis of a Sustainable Urban Drainage System" aims to address the critical issue of urban drainage in modern cities. Urb...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Enhancing the Durability of Concrete Structures through the Application of Advanced ...

The project topic, "Enhancing the Durability of Concrete Structures through the Application of Advanced Materials," focuses on improving the longevity...

BP
Blazingprojects
Read more →
Civil engineering. 3 min read

Analysis and Design of Sustainable Low-Carbon Building Materials for High-Rise Const...

The research project titled "Analysis and Design of Sustainable Low-Carbon Building Materials for High-Rise Construction" aims to address the growing ...

BP
Blazingprojects
Read more →
Civil engineering. 3 min read

Optimization of Concrete Mix Designs for Sustainable Construction Practices...

The project titled "Optimization of Concrete Mix Designs for Sustainable Construction Practices" aims to address the growing need for environmentally ...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us