MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA

 

Table Of Contents


Cover page

Title page

Certification

Dedication

Acknowledgement

Abstract

Organization of the work

Table of Content


Thesis Abstract

Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study’s data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study’s data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful
tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.


Thesis Overview

INTRODUCTION
1.1 Background to the study
The importance of ensuring accuracy and reliability of construction time estimates at the tendering stage cannot be overemphasized. Accurate early estimates of construction time typically provides clients and contractors with a basis for evaluating the success of a project and the efficiency of the project organisation (Nkado, 1995). They also provide them with a basis for ascertaining logistical and cash flow implications for feasibility, budgeting, planning, monitoring and even litigation purposes (Skitmore and Ng, 2003). Furthermore, they serve as a criteria in determining the best combination when performing time-cost optimization (Que, 2002). It is therefore clear that construction time has become a vital tool used by clients and contractors to ensure the success of construction projects. This success will however, only be achieved when construction time is accurately predicted.
Construction time/periods are often calculated on the basis of the planner’s own previous experience on similar projects (Choudhury and Phatak, 2004). However, as pointed out by Skitmore and Ng (2003), the need to reduce the problem of subjectivity associated with the planner’s experience and judgement to correctly interpret project and site information and make the best possible decisions, has long resulted in the development of construction time predicting models.
The development of construction time predicting models commenced with the use of project scope factors. Project scope is a measure of project size, which can be described as construction cost, project duration, gross floor area, number of storey, building type and procurement method (Walker, 1995).


Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Quantity Surveying. 4 min read

Cost Estimation and Analysis of Green Building Materials in Construction Projects...

The project titled "Cost Estimation and Analysis of Green Building Materials in Construction Projects" aims to investigate the cost implications and b...

BP
Blazingprojects
Read more →
Quantity Surveying. 3 min read

Utilizing Building Information Modeling (BIM) for Cost Estimation and Management in ...

The utilization of Building Information Modeling (BIM) for cost estimation and management in construction projects is a crucial aspect of modern construction pr...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Application of Building Information Modeling (BIM) in Quantity Surveying for Cost Es...

The project titled "Application of Building Information Modeling (BIM) in Quantity Surveying for Cost Estimation and Project Management" aims to explo...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Cost Management Strategies for Green Building Construction Projects in Urban Areas...

The project on "Cost Management Strategies for Green Building Construction Projects in Urban Areas" aims to investigate and analyze the various strate...

BP
Blazingprojects
Read more →
Quantity Surveying. 3 min read

Utilizing Building Information Modeling (BIM) for Cost Estimation in Construction Pr...

The research project, "Utilizing Building Information Modeling (BIM) for Cost Estimation in Construction Projects: A Case Study in Quantity Surveying,"...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Optimizing Cost Management Strategies for Sustainable Construction Projects in Urban...

The research project titled "Optimizing Cost Management Strategies for Sustainable Construction Projects in Urban Areas" aims to address the critical ...

BP
Blazingprojects
Read more →
Quantity Surveying. 4 min read

Risk Management in Construction Projects: A Quantitative Analysis of Cost Overruns...

The research project titled "Risk Management in Construction Projects: A Quantitative Analysis of Cost Overruns" aims to investigate the various risks...

BP
Blazingprojects
Read more →
Quantity Surveying. 3 min read

The Application of Building Information Modeling (BIM) in Quantity Surveying Practic...

The project titled "The Application of Building Information Modeling (BIM) in Quantity Surveying Practices" aims to investigate and analyze the utiliz...

BP
Blazingprojects
Read more →
Quantity Surveying. 2 min read

Cost Estimation and Analysis of Sustainable Construction Practices in High-Rise Buil...

The project titled "Cost Estimation and Analysis of Sustainable Construction Practices in High-Rise Buildings" aims to investigate and analyze the cos...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us