Home / Electrical electronics engineering / Design and construction of an automatic change-over switch with generator cut off and starter

Design and construction of an automatic change-over switch with generator cut off and starter

 

Table Of Contents


Thesis Abstract

Thesis Overview

<p> </p><p><strong>INTRODUCTION</strong></p><p><strong>1.1 &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; </strong><strong>Background of The project</strong></p><p>The increase rate of epileptic power supply especially in tropical African countries where Nigeria forms a part has become a major concern. The power supply instability in developing countries creates a need to device means for alternative power sources. The automation of electrical power generation or alternative sources of power to back up the utility supply could lead to power stability. This automation becomes necessary as the rate of power outage becomes predominantly high. The residence, commercial and industries dependent on generators and public power change-over between these two power supplying sources are manual, human error during change-over connections may occur; leading to machine damage, electric shock/electrocution as well as increased down time consequently introducing massive losses (Mazur and Rocks, 2010). However, when automation takes place between the mains supply and generator it will automatically switch from mains to the generator when there is power failure by starting generator and cut off the generator switching to the mains when there is public power. This help to reduce down time thereby maintaining constant power supply.</p><p><strong>1.2 &nbsp; &nbsp; &nbsp; &nbsp;</strong><strong>Statement of the Problem</strong></p><p>Nowadays securing constant power supply is becoming more important. In Nigeria, power supply for domestic use, commercial and industries is highly unstable. The applications of alternative sources are associated with challenge of switching smoothly and timely between the mains supply and the alternative sources whenever there is power failure on the mains source. The use of an automatic changeover switch with generator cut off and starter eliminate the stress encountered when switching from mains supply to generator Vis visa and reduce time loss for increase productivity.</p><p><strong>1.3 &nbsp; &nbsp; </strong><strong>Aim and Objectives</strong></p><p>This project focuses on the design and construction of an automatic change-over switch with generator cut off and starter.</p><p>Hence, the specific objectives are as follow;</p><p>1. &nbsp;To provide a system that automatically switches on the generator and switch over the load to the generator whenever there is mains power failure.</p><p>2. &nbsp;To provide a device that automatically switches over to mains supply once restored and simultaneously switches off the generator.</p><p><strong>1.4 &nbsp; &nbsp; </strong><strong>Scope of the Study</strong></p><p>The scope of this project is centered the on the design and construction of a change-over switch with cut off and starter of a generator with a capacity of 3.5 KVA.</p><p>The project is designed for power supply applications. It involves automatic changeover between the main power supply and an auxiliary power supply, such as a generator. The project implements an automatic switching or starting of the power generator whenever the main power fails.</p><p><strong>1.5 &nbsp; &nbsp; </strong><strong>Limitation of the Study</strong></p><p>The automatic changeover switch with generator cut off and starter does not function with a faulty generating set.</p><p>It does not function with generators that have a manual starter which is a sine quo non to the function of the automatic change-over.</p><p><strong>1.6 Significance of the Study</strong></p><p>The significance of this work cannot be overemphasized. Therefore, benefits that are associated to the change-over switch are;</p><p>1. &nbsp;It minimizes damages to lives and equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.</p><p>2. &nbsp;It reduces change-over time to a minimum, due to its fast response to power restoration.</p><p>3. &nbsp;It maintains high quality of service through its fast and prompt response.</p><p>4. &nbsp;Moreover, the unit is portable, easy, convenient and safe to install.</p> <br><p></p>

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Electrical electroni. 4 min read

Design and implementation of a smart grid system for efficient energy management...

The project on the "Design and Implementation of a Smart Grid System for Efficient Energy Management" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and Implementation of a Smart Home Automation System Using Internet of Things...

The project titled "Design and Implementation of a Smart Home Automation System Using Internet of Things (IoT) Technology" aims to explore the integra...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and implementation of a smart home energy management system using Internet of...

The project titled "Design and implementation of a smart home energy management system using Internet of Things (IoT) technology" aims to address the ...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and implementation of real-time power monitoring system using IoT technology ...

The project titled "Design and Implementation of Real-Time Power Monitoring System Using IoT Technology for Smart Homes" focuses on the development of...

BP
Blazingprojects
Read more →
Electrical electroni. 2 min read

Design and Implementation of Power Factor Correction Circuit for Residential Applica...

The project on "Design and Implementation of Power Factor Correction Circuit for Residential Applications" aims to address the issue of power factor i...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and Implementation of a Smart Grid System Using IoT Technology in a Local Pow...

The project "Design and Implementation of a Smart Grid System Using IoT Technology in a Local Power Distribution Network" aims to revolutionize the tr...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and Implementation of an IoT-based Home Energy Management System...

The project titled "Design and Implementation of an IoT-based Home Energy Management System" aims to address the growing demand for efficient energy m...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of a smart home system using Internet of Things (IoT) tech...

The project titled "Design and implementation of a smart home system using Internet of Things (IoT) technology" aims to revolutionize the way homes ar...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and Implementation of a Smart Grid System for Renewable Energy Integration...

The research project titled "Design and Implementation of a Smart Grid System for Renewable Energy Integration" aims to address the growing need for s...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us