This research project focuses on the design and construction of an automatic change-over switch with generator cut off and starter. The automatic change-over switch is a critical component in electrical systems to ensure seamless transition between utility power and backup power, such as a generator. The system incorporates a generator cut off feature to prevent back-feeding into the utility grid, enhancing safety and compliance with regulations. The design of the automatic change-over switch involves selecting suitable components such as contactors, relays, and sensors to enable automatic switching based on power availability. The system is equipped with sensors to detect power outage or fluctuations, prompting the switch to activate the generator and disconnect from the utility supply. This automation reduces downtime and manual intervention during power outages, making it ideal for residential and commercial applications. Additionally, the inclusion of a starter mechanism for the generator enhances the overall functionality of the system. The starter ensures reliable and efficient operation of the generator, especially during cold starts or extended power outages. By integrating the starter with the change-over switch, the system offers a comprehensive solution for seamless power management and backup. The construction of the automatic change-over switch involves careful assembly of components, wiring, and testing to ensure proper functionality and safety. Detailed wiring diagrams and instructions are provided to guide the assembly process, making it accessible for individuals with basic electrical knowledge. The system is designed to be compact and easy to install, suitable for retrofitting existing electrical systems or integrating into new constructions. Overall, the automatic change-over switch with generator cut off and starter offers a reliable and efficient solution for managing power supply during outages. The system's automation capabilities reduce the reliance on manual intervention, ensuring uninterrupted power supply for critical applications. With a focus on safety, functionality, and ease of installation, this project aims to provide a practical and cost-effective solution for improving power resilience in various settings.

Thesis Overview

INTRODUCTION

1.1             Background of The project

The increase rate of epileptic power supply especially in tropical African countries where Nigeria forms a part has become a major concern. The power supply instability in developing countries creates a need to device means for alternative power sources. The automation of electrical power generation or alternative sources of power to back up the utility supply could lead to power stability. This automation becomes necessary as the rate of power outage becomes predominantly high. The residence, commercial and industries dependent on generators and public power change-over between these two power supplying sources are manual, human error during change-over connections may occur; leading to machine damage, electric shock/electrocution as well as increased down time consequently introducing massive losses (Mazur and Rocks, 2010). However, when automation takes place between the mains supply and generator it will automatically switch from mains to the generator when there is power failure by starting generator and cut off the generator switching to the mains when there is public power. This help to reduce down time thereby maintaining constant power supply.

1.2        Statement of the Problem

Nowadays securing constant power supply is becoming more important. In Nigeria, power supply for domestic use, commercial and industries is highly unstable. The applications of alternative sources are associated with challenge of switching smoothly and timely between the mains supply and the alternative sources whenever there is power failure on the mains source. The use of an automatic changeover switch with generator cut off and starter eliminate the stress encountered when switching from mains supply to generator Vis visa and reduce time loss for increase productivity.

1.3     Aim and Objectives

This project focuses on the design and construction of an automatic change-over switch with generator cut off and starter.

Hence, the specific objectives are as follow;

1.  To provide a system that automatically switches on the generator and switch over the load to the generator whenever there is mains power failure.

2.  To provide a device that automatically switches over to mains supply once restored and simultaneously switches off the generator.

1.4     Scope of the Study

The scope of this project is centered the on the design and construction of a change-over switch with cut off and starter of a generator with a capacity of 3.5 KVA.

The project is designed for power supply applications. It involves automatic changeover between the main power supply and an auxiliary power supply, such as a generator. The project implements an automatic switching or starting of the power generator whenever the main power fails.

1.5     Limitation of the Study

The automatic changeover switch with generator cut off and starter does not function with a faulty generating set.

It does not function with generators that have a manual starter which is a sine quo non to the function of the automatic change-over.

1.6 Significance of the Study

The significance of this work cannot be overemphasized. Therefore, benefits that are associated to the change-over switch are;

1.  It minimizes damages to lives and equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.

2.  It reduces change-over time to a minimum, due to its fast response to power restoration.

3.  It maintains high quality of service through its fast and prompt response.

4.  Moreover, the unit is portable, easy, convenient and safe to install.


Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Electrical electroni. 4 min read

Design and Implementation of Smart Grid Technology for Renewable Energy Integration ...

The project titled "Design and Implementation of Smart Grid Technology for Renewable Energy Integration in Microgrids" focuses on the development and ...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of an energy-efficient smart home system using IoT technol...

The project titled "Design and Implementation of an Energy-Efficient Smart Home System Using IoT Technology" focuses on the development of a cutting-e...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and implementation of a smart grid system for efficient energy management...

The project on the "Design and Implementation of a Smart Grid System for Efficient Energy Management" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and Implementation of a Smart Home Automation System Using Internet of Things...

The project titled "Design and Implementation of a Smart Home Automation System Using Internet of Things (IoT) Technology" aims to explore the integra...

BP
Blazingprojects
Read more →
Electrical electroni. 3 min read

Design and implementation of a smart home energy management system using Internet of...

The project titled "Design and implementation of a smart home energy management system using Internet of Things (IoT) technology" aims to address the ...

BP
Blazingprojects
Read more →
Electrical electroni. 2 min read

Design and implementation of real-time power monitoring system using IoT technology ...

The project titled "Design and Implementation of Real-Time Power Monitoring System Using IoT Technology for Smart Homes" focuses on the development of...

BP
Blazingprojects
Read more →
Electrical electroni. 2 min read

Design and Implementation of Power Factor Correction Circuit for Residential Applica...

The project on "Design and Implementation of Power Factor Correction Circuit for Residential Applications" aims to address the issue of power factor i...

BP
Blazingprojects
Read more →
Electrical electroni. 2 min read

Design and Implementation of a Smart Grid System Using IoT Technology in a Local Pow...

The project "Design and Implementation of a Smart Grid System Using IoT Technology in a Local Power Distribution Network" aims to revolutionize the tr...

BP
Blazingprojects
Read more →
Electrical electroni. 4 min read

Design and Implementation of an IoT-based Home Energy Management System...

The project titled "Design and Implementation of an IoT-based Home Energy Management System" aims to address the growing demand for efficient energy m...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us