Home / Building / EFFECT OF FAULTY DESIGN AND CONSTRUCTION ON BUILDING MAINTENANCE (CASE STUDY OF AFDIN AND MOTHER CAT CONSTRUCTION COMPANIES IN KADUNA STATE)

EFFECT OF FAULTY DESIGN AND CONSTRUCTION ON BUILDING MAINTENANCE (CASE STUDY OF AFDIN AND MOTHER CAT CONSTRUCTION COMPANIES IN KADUNA STATE)

 

Table Of Contents


<p>&nbsp;     <b>TABLE OF CONTENTS</b></p><p>Title page----------------------------------------------------------------------------------i</p><p>&nbsp;Declaration-------------------------------------------------------------------------------ii&nbsp;</p><p>Certification--------------------------------------------------------------------------------iii&nbsp;</p><p>Dedication---------------------------------------------------------------------------------iv</p><p>Acknowledgment-------------------------------------------------------------------------v</p><p>Abstract-------------------------------------------------------------------------------------vi</p><p>Table of Contents-------------------------------------------------------------------------vii&nbsp;</p><p><b>

Chapter ONE

---------------------------------------------------------------------------1&nbsp;</b></p><p>1.0 INTRODUCTION---------------------------------------------------------------------1&nbsp;</p><p>1.1 Background of the Study-----------------------------------------------------------1&nbsp;</p><p>1.2 Statement of Problem---------------------------------------------------------------4&nbsp;</p><p>1.3 The Present Work--------------------------------------------------------------------4&nbsp;</p><p>1.4 Aim and Objectives-------------------------------------------------------------------5&nbsp;</p><p>1.5 Scope and Limitation----------------------------------------------------------------5&nbsp;</p><p>1.6 Significance of the Study-----------------------------------------------------------6&nbsp;</p><p><b>

Chapter TWO

---------------------------------------------------------------------------7</b>&nbsp;</p><p>2.0 LITERATURE REVIEW-------------------------------------------------------------7&nbsp;</p><p>2.1 Concept of Building Maintenance------------------------------------------------7&nbsp;</p><p>2.2 Definition of Building Maintenance----------------------------------------------7&nbsp;</p><p>2.3 Types of Maintenance--------------------------------------------------------------7&nbsp;</p><p>2.4 Forms of Maintenance--------------------------------------------------------------9&nbsp;</p><p>2.5 Importance of building Maintenance------------------------------------------10&nbsp;</p><p>2.6 Faulty Design-----------------------------------------------------------------------11&nbsp;</p><p>2.7 Faulty Construction----------------------------------------------------------------12&nbsp;</p><p>2.8 Defects in Civil Design-----------------------------------------------------------16&nbsp;</p><p>2.8.1 Inadequate provisions for movement-------------------------------------16&nbsp;</p><p>2.8.2 Ignoring aggressive environment &amp; weather condition effects------16&nbsp;</p><p>2.8.3 Ignoring biological effects-----------------------------------------------------17&nbsp;</p><p>2.8.4 Inadequate structural design------------------------------------------------17&nbsp;</p><p>2.8.5 Ignoring variation in soil conditions----------------------------------------17&nbsp;</p><p>2.8.6 Ignoring load impact on structural stability------------------------------18&nbsp;</p><p>2.8.7 Exceeding allowable deflection--------------------------------------------18&nbsp;</p><p>2.8.8 Ignoring wind effect on the structure-------------------------------------18&nbsp;</p><p>2.8.9 Inadequate concrete cover on the reinforcement--------------------18&nbsp;</p><p>2.8.10Improperly locating conduits and pipe openings at critical structural locations---------------------------------------------------------------------------------18&nbsp;</p><p>2.9 Architectural Defects in Design----------------------------------------------19&nbsp;</p><p>2.9.1 Narrow stairs passages &amp; doors-------------------------------------------19&nbsp;</p><p>2.9.2 Not relating exterior material selection to climatic condition-------19&nbsp;</p><p>2.9.3 Specifying finishing which needs to be repaired as a whole---------19&nbsp;</p><p>2.9.4 Not considering the local climatic conditions when designing the exterior shape---------------------------------------------------------------------------19&nbsp;</p><p>2.9.5 Inadequate joints between finished faces-------------------------------20&nbsp;</p><p>2.10 Design Defects in Maintenance Practicality and Adequacy---------20&nbsp;</p><p>2.10.1 Not considering space or exit for maintenance worker, equipment-20</p><p>&nbsp;2.10.2 Designing for permanent fixing which should be removable for maintenance---------------------------------------------------------------------------20&nbsp;</p><p>2.10.3 Not considering the available maintenance equipment when performing the design---------------------------------------------------------------20&nbsp;</p><p>2.10.4 Not considering the maintenance requirements in design--------21&nbsp;</p><p>2.11 Defects Due to Consultant Firm Administration &amp;Staff---------------21&nbsp;</p><p>2.11.1 Lack of Q.A/Q.C program during design------------------------------21&nbsp;</p><p>2.11.2 Poor technical updating or staff training-------------------------------21&nbsp;</p><p>2.11.3 Hiring unqualified designers---------------------------------------------21&nbsp;</p><p>2.11.4 Designer field experience-------------------------------------------------22&nbsp;</p><p>2.11.5 Designer technical background---------------------------------------------22&nbsp;</p><p>2.11.6 Designer ignorance of materials properties------------------------------22&nbsp;</p><p>2.11.7 Misjudgment of climatic conditions-----------------------------------------22&nbsp;</p><p>2.11.8 Misjudgment of user‘s intended use----------------------------------------23&nbsp;</p><p>2.12 Defects Due to Construction Drawing--------------------------------------23&nbsp;</p><p>2.12.1 Lack of references-------------------------------------------------------------23&nbsp;</p><p>2.12.2 Conflicting details--------------------------------------------------------------23&nbsp;</p><p>2.12.3 Lack of details-------------------------------------------------------------------23&nbsp;</p><p>2.13 Defects due to Construction Inspection------------------------------------24&nbsp;</p><p>2.13.1 Lack of inspection--------------------------------------------------------------24&nbsp;</p><p>2.13.2 Unqualified inspector-----------------------------------------------------------24&nbsp;</p><p>2.13.3 Proponent negligence of the importance of inspection----------------24&nbsp;</p><p>2.13.4 Weakness of inspection rule implementing corrective actions during job execution------------------------------------------------------------------------------25&nbsp;</p><p>2.14 Defects due to Civil Construction----------------------------------------------25&nbsp;</p><p>2.14.1 Inaccurate measurement----------------------------------------------------25&nbsp;</p><p>2.14.2 Damaged form of work-------------------------------------------------------25&nbsp;</p><p>2.14.3 Excavation too close to the building--------------------------------------26&nbsp;</p><p>2.14.4 Painting in unsuitable condition or on unsuitable surface------------26&nbsp;</p><p>2.14.5 Inadequate water proofing and drainage----------------------------------26</p><p>2.14.6 Insufficient reinforcement concrete cover---------------------------------26</p><p>&nbsp;2.14.7 Cold joints------------------------------------------------------------------------27&nbsp;</p><p>2.14.8 Loss in adhesion between materials---------------------------------------27</p><p>&nbsp;2.14.9 Early form work-----------------------------------------------------------------27</p><p>2.14.10 Poor soil compaction-------------------------------------------------------27&nbsp;</p><p>2.14.11 Inadequate curing----------------------------------------------------------27&nbsp;</p><p>2.14.12 Lack of communications-------------------------------------------------28&nbsp;</p><p>2.15 Defects due to Contractor Administration--------------------------------28&nbsp;</p><p>2.15.1 Not complying with specification-----------------------------------------28&nbsp;</p><p>2.15.2 Unable to read drawings---------------------------------------------------29&nbsp;</p><p>2.15.3 Insufficient site supervision------------------------------------------------29&nbsp;</p><p>2.15.4 Poor communication with the consultant and the owner-----------29&nbsp;</p><p>2.15.5 Unqualified supervision-----------------------------------------------------29&nbsp;</p><p>2.15.6 Speedy completion or cheap quality work-----------------------------30&nbsp;</p><p>2.15.7 Unqualified work force-------------------------------------------------------30&nbsp;</p><p>2.15.8 Multinational construction experience------------------------------------30&nbsp;</p><p>2.16 Defects due to Construction Materials---------------------------------------30</p><p>2.16.1 Different thermal movements in dissimilar materials------------------31&nbsp;</p><p>2.16.2 Selection of material which is unsuitable for existing climatic conditions----------------------------------------------------------------------------------31&nbsp;</p><p>2.16.3 Use of nondurable material-------------------------------------------------31&nbsp;</p><p>2.16.4 Use of expired material-----------------------------------------------------31&nbsp;</p><p>2.16.5 Poor material handling and storage-------------------------------------31&nbsp;</p><p>2.17 Defects due to construction equipment-------------------------------------31&nbsp;</p><p>2.17.1 Wrong use of equipment-----------------------------------------------------32&nbsp;</p><p>2.17.2 Inadequate performance of equipment----------------------------------32&nbsp;</p><p>2.17.3 Lack of required amount of equipment-----------------------------------32&nbsp;</p><p>2.18 Defects due to Construction Specification---------------------------------32&nbsp;</p><p>2.18.1 Unclear specification----------------------------------------------------------32&nbsp;</p><p>2.18.2 Not defining adequate material types------------------------------------33&nbsp;</p><p>2.18.3 Not specifying the QA/QC construction procedure-------------------33&nbsp;</p><p>2.18.4 Not specifying the allowable load limits----------------------------------33&nbsp;</p><p>2.18.5 Specifying inadequate mix design----------------------------------------33&nbsp;</p><p>2.19 Effects of Defects on Building Maintenance-----------------------------34&nbsp;</p><p>2.20 Review of Related Past Works---------------------------------------------34&nbsp;</p><p>2.21 Research Gap-----------------------------------------------------------------39&nbsp;</p><p><b>

Chapter THREE

------------------------------------------------------------------40&nbsp;</b></p><p>3.0 MATERIALS AND METHOD-------------------------------------------------40&nbsp;</p><p>3.1.1 Research Methodology-----------------------------------------------------40&nbsp;</p><p>3.2 Population Area of the Study-----------------------------------------------40&nbsp;</p><p>3.3 Method of Data Collection---------------------------------------------------40&nbsp;</p><p>3.4 Data Analysis-------------------------------------------------------------------40</p><p>3.5 Spearman Rank Correlation-------------------------------------------------41&nbsp;</p><p>3.6 Test of Hypothesis-----------------------------------------------------------------41&nbsp;</p><p><b>

Chapter FOUR

-----------------------------------------------------------------------43</b>&nbsp;</p><p>4.0 RESULTS AND DISSCUSSION-----------------------------------------------43&nbsp;</p><p>4.1 Presentation of Results------------------------------------------------------------43&nbsp;</p><p>4.2 Discussion of Findings-------------------------------------------------------------56&nbsp;</p><p><b>

Chapter FIVE

-------------------------------------------------------------------------57&nbsp;</b></p><p>5.0 CONCLUSION--------------------------------------------------------------------57&nbsp;</p><p>5.1 Recommendations-------------------------------------------------------------58&nbsp;</p><p>REFERENCES----------------------------------------------------------------------59&nbsp;</p><p>APPENDIX A--------------------------------------------------------------------------63&nbsp;</p>

Thesis Abstract

<p>&nbsp;           <b>ABSTRACT</b></p><p>&nbsp;The study examined the effects of faulty design and construction on the maintenance of building. A survey of randomly selected samples of 20 builders and 15 architects were conducted. Questionnaires were used to collect data from Architects and Builders. The survey included 11 groups of defects and sub defects in each groups. The predominant severity effects of each defects was assessed and ranked based on the severity index as ranked by both the Builders and the Architects. The results shows that 7 defects were rated as most severe, 54 as moderately severe and 6 defects as slightly severe defects. The results also show that increase in maintenance work is the most predominant effects on building maintenance among other factors of defect with an index value of 100.00 as perceived by both the rank of the Architects and that of the builders. The research however includes a hypothesis that Architects and Builders generally agree on the ranking of the severity defects which was tested and proven to be true. The study concluded that there should be a design review before finally approving the design for construction; maintenance expert should not be overlooked in the planning stage of the project and most importantly the employment of professionals for any building projects. <br></p>

Thesis Overview

<p> <b>1.0 INTRODUCTION&nbsp;</b></p><p><b>1.1 BACKGROUND OF THE STUDY</b></p><p>&nbsp;'To fail to plan is to plan to fail.'— (Wood, 2003) The essence of all result-oriented work may be identified in this quotation. In the context of design one can adapt this phrase to, 'if a designer fails to plan well the plan will turn out badly'. In understanding this phrase one can use a law of physics as a metaphor. Newton's third law of force is 'For every action there is a reaction'. For designers this law could be interpreted as 'for every design decision/consideration (action) there is a consequence (reaction)'. As such this research tries to explore the actions of design and the consequence of their actions.&nbsp;</p><p>The relationship between design, construction and maintenance is closely related but not easily distinguished. (Maisarah, 2012) explained the vital role of design in the early stage of project management. They stated that a functional design can promote skill; economy, conveniences, and comforts while a non-functional design can impeded activities of all types of detract from quality of care, and raise cost to intolerable levels.&nbsp;</p><p>A typical saying by Vonnegut: everybody want to build and nobody want to do maintenance. In Nigeria building design are copied from other countries without considering the conditions that lead to such design, hence maintenance experts are seldom included to advice on maintenance efficiency of such design. In a related development (Iyagba, 2005) reveal that there are substantial numbers of people who do not know the meaning of maintenance. The mistakes most designer made is believing that a building that is design with the best aesthetics materials requires little or no maintenance, but such notion or argument are wrong because The&nbsp; maintenance of a building begins after the construction is completed (Haniff, 2007). (Eizzatul, 2012) observed that the maintainability aspect at the design stage is often ignored and this has contributed to future problems when implementing maintenance work. He further explained that this happens when the aesthetics value has become more important in the design of asset, besides the design factor, site selection, apparatus, tools or facilities to maintain the asset are hard to obtain or very costly. According to (Rozita, 2006) the effectiveness of the building is not dependent on its aesthetic value but on the ability to perform maintenance works on the building in the future. Just like the military slogan that if you fail to plan, and then you are planning to fail. That is, if a building is design and constructed without any plan for maintenance the building is hovering towards failure.&nbsp;</p><p>According (Norhanizaetal, 2007) if the designer failed to plan well the entire plan would also fail. Every decision made during the building design and construction has its own impact, too often the professionals that constructs and design don‘t worry whether the building they design and build will work properly, their major concern is just to complete the project and move to the next job while the consequence is left for the client to handle. The effect of faulty building design and construction has become one of the major issues in maintaining building in Nigeria. Nigeria has a population estimated to be around 150 million which has the largest black populace in the world and as such new building are being built daily to accommodate the demands of the teeming population, this has lead to the desperation of every single individual to have a building of his own , the consequence is that an inexperience designer is given a contract to design and same to another to construct in a short period of time which will result in many defects especially during the design and construction stage and this will inevitably result in high maintenance cost. (Abdulmohsen and sadi, 1997) stated that the increase in 3 maintenance cost is attributed to the failure of the building design. If we compare the production of as cars, for example a car is designed and then built; it is tested exhaustively, fault identified and then rectified. If we relate this to building work, we need to construct a building, test if overtime and then demolish and rebuild, removing all problem in the next design.&nbsp;</p><p>Faulty construction also accounts for many building failure, if a new copied design has not been specified or built previously(most especially designed copied from abroad) the builder will have no experience of this design and may build it incorrectly resulting in high cost of maintenance with inherent defects. It is therefore sacrosanct for both the designer and the builder to consider the importance of maintenance at the onset of the design because decision made at the planning stage have a large effect on the maintenance of the building and the cost. It is most times worry some that most building expert that suppose to educate the public on the importance of building maintenance will say age building result in high cost of maintenance. To avoid the implication of design faults on the need for future maintenance, constant research and close observation of existing methods of design and construction practice are needed. In addition, it requires more international forums to address and exchange the issues and experiences seen in different parts of world. In Singapore, an analysis of defects in wet areas of buildings by (Chew, 2005) reported faults in design, the construction phase and material selection. The main sources of defects were the mistakes made at the design stage, construction phase, maintenance practice and in materials selection. The defects that resulted from these failures included tile debonding, mastic failure, the staining of tiles, cracking, water leakage through cracks, water leakage where pipes passed through walls, paint defects, water ponding, spalling of concrete and unevenness of tile surface and poor pointing. This long list of 4 defects is only those found in the wet areas of buildings which constitute only a small part of the total building. This alarming amount of design faults also creates an opportunity for similar research in other parts of the building as well.&nbsp;</p><p><b>1.2 STATEMENT OF PROBLEM</b></p><p>Nigerian is a rich developing country with huge capital resources. It is developing very fast in every area including building construction. Public and private sectors have initiated the need for large and complex construction projects. Meeting the high demand of both parties in a short time, it is expected that many errors and defects have concerned during the design and construction stages which will result later in high maintenance costs and breakdown of structural component.&nbsp;</p><p>Despite the various strategies being adopted by the government for the maintenance of those facilities, the buildings remain a home for defects that should have been avoided if proper feasibility planning on maintenance has been given cognizance right from the design and construction stage of the project. This has led to unnecessary expenditure from the various authorities in carrying out remedial work to curb the effects. (Brennan, 2000) opined that the main purpose of maintenance of property is essentially to retain it values for investment, aesthetics, safety and durability with a view to ensuring that the property is continually used for habitation and to satisfaction of the owner.</p><p>&nbsp;It was even observed that majority of the new construction were being built up with defects which later transpire into substantial expenses on maintenance.&nbsp;</p><p><b>1.3 THE PRESENT WORK</b></p><p>This present research is concerned with the investigation of the effects of faulty design and construction on Building maintenance. Questionnaires were used to collect data from designers and Builders. The predominant severity effects of each defects was assess and rank based on the severity index as ranked by both the Builders and&nbsp; the designer using SPSS 20. This was used to determine whether there is a correlation between designer and construction professionals.&nbsp;</p><p><b>1.AIM AN OBJECTION&nbsp;</b></p><p>The aim of this research is to investigate the effects of faulty design and construction on Building maintenances. The specific objectives of this research are:&nbsp;</p><p>i. To identify the building defects caused by faulty design and construction on building maintenance</p><p>&nbsp;ii. To determine the severity index of all defects identified and classify them by severity using SPSS 20.&nbsp;</p><p>iii. To determine the severity index for each defect within the group and classify them by severity using SPSS 20.&nbsp;</p><p>iv. To assess the effects of the building defects caused by faulty design and 1.6&nbsp;</p><p><b>1.2 SGNIFIANCE OF THE STUDY</b></p><p>&nbsp;Previous research has shown that the cost of maintaining a building usually involve large amount of expenditure which most times surpass the cost of building structure itself. Therefore, design and construction play a vital role in deciding if defect will transpire later in the building. Hence, by getting it right from the onset of the building can go a long way in minimizing mistakes and error that might occur during construction.&nbsp;</p>

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Building. 3 min read

Implementation of Smart Building Energy Management System...

The project titled "Implementation of Smart Building Energy Management System" aims to address the growing need for more sustainable and efficient ene...

BP
Blazingprojects
Read more →
Building. 4 min read

Implementation of Smart Building Automation System using IoT Technology...

The project titled "Implementation of Smart Building Automation System using IoT Technology" aims to explore the integration of Internet of Things (Io...

BP
Blazingprojects
Read more →
Building. 3 min read

Development of an Energy-Efficient Smart Building System...

The project titled "Development of an Energy-Efficient Smart Building System" aims to address the growing need for sustainable and environmentally fri...

BP
Blazingprojects
Read more →
Building. 2 min read

Integration of Renewable Energy Sources in Building Design for Enhanced Sustainabili...

The project titled "Integration of Renewable Energy Sources in Building Design for Enhanced Sustainability" aims to explore the integration of renewab...

BP
Blazingprojects
Read more →
Building. 2 min read

Implementation of Green Building Technologies for Sustainable Construction Practices...

The project titled "Implementation of Green Building Technologies for Sustainable Construction Practices" focuses on the integration of environmentall...

BP
Blazingprojects
Read more →
Building. 3 min read

Design and Implementation of a Smart Energy Management System for Residential Buildi...

The project titled "Design and Implementation of a Smart Energy Management System for Residential Buildings" aims to address the growing importance of...

BP
Blazingprojects
Read more →
Building. 2 min read

Design and Construction of a Sustainable Green Building Using Recycled Materials...

The project titled "Design and Construction of a Sustainable Green Building Using Recycled Materials" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more →
Building. 2 min read

Analysis and optimization of energy consumption in smart buildings....

The research project titled "Analysis and Optimization of Energy Consumption in Smart Buildings" aims to investigate and improve the energy efficiency...

BP
Blazingprojects
Read more →
Building. 2 min read

Design and Analysis of Sustainable Building Materials for High-Rise Structures...

The project titled "Design and Analysis of Sustainable Building Materials for High-Rise Structures" aims to address the increasing need for environmen...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us