Home / Building / EVALUATION OF CONSTRUCTION FORMWORK PRACTICES AND SAFETY ON PROJECTS IN NIGERIA

EVALUATION OF CONSTRUCTION FORMWORK PRACTICES AND SAFETY ON PROJECTS IN NIGERIA

 

Table Of Contents


<p>&nbsp;      <b>T</b><b>ABLE OF CONTENTS&nbsp;</b></p><p>ACKNOWLEDGMENTS ....................................................................................... ii&nbsp;</p><p>LIST OF TABLES....................................................................................................v&nbsp;</p><p>LIST OF FIGURES ................................................................................................ vi</p><p>&nbsp;ABSTRACT......................................................................................................... viii&nbsp;</p><p>

Chapter 1

ABOUT THIS THESIS ...................................................................1&nbsp;</p><p>1.1 Introduction.................................................................................................... 1&nbsp;</p><p>1.2 Research Objectives and Analysis Approach ................................................ 3&nbsp;</p><p>1.3 Reader’s Guide................................................................................................ 6</p><p><b>

Chapter TWO

</b>&nbsp;</p><p>ELEVATED FORMWORK FAILURE DURING CONSTRUCTION..........................7</p><p>2.1 Definition of Elevated Formwork............................................................... 7&nbsp;</p><p>2.2 Criteria of Formwork ....................................................................................... 8&nbsp;</p><p>2.2.1 Design Regulations...................................................................................... 8&nbsp;</p><p>2.2.2 Construction and Safety Regulations......................................................... 10&nbsp;</p><p>2.2.3 Sequences of Concrete Placement ............................................................ 11&nbsp;</p><p>2.3 Case Study: Formwork Failures during Concrete Construction..................... 13&nbsp;</p><p>2.3.1 Formwork Failures in South Korea............................................................ 13&nbsp;</p><p>2.3.2 Main Causes of Formwork Failures............................................................ 14</p><p><b>

Chapter THREE

...............................................................................................17</b>&nbsp;</p><p>3 INVESTIGATION ON ELEVATED FORMWORK DURING CONSTRUCTION...17</p><p>&nbsp;3.1 Analysis of Low-clearance Elevated Formwork............................................ 17&nbsp;</p><p>3.1.1 Overview of Field Survey .......................................................................... 17&nbsp;</p><p>3.1.2 Field Investigation....................................................................................... 20&nbsp;</p><p>3.1.2.1 Present status for construction ...............................................................20&nbsp;</p><p>3.1.2.2 Sequence of placing fresh concrete........................................................22&nbsp;</p><p>3.1.3 Summary .................................................................................................... 23&nbsp;</p><p>3.2 Analysis of High-clearance Elevated Formwork............................................ 24&nbsp;</p><p>3.2.1 Overview of an Interview.............................................................................. 24</p><p>&nbsp;3.2.2 Questionnaire Survey................................................................................. 25&nbsp;</p><p>3.2.2.1 Present status for construction ................................................................25&nbsp;</p><p>3.2.2.2 Sequence of placing fresh concrete.........................................................29&nbsp;</p><p>3.2.3 Overview of Field Survey ........................................................................... 31&nbsp;</p><p>3.2.4 Field Investigation....................................................................................... 33&nbsp;</p><p>3.2.4.1 Present status for construction ................................................................33&nbsp;</p><p>3.2.4.2 Sequence of placing fresh concrete.........................................................37&nbsp;</p><p>3.2.5 Summary .................................................................................................... 38&nbsp;</p><p><b>

Chapter FOUR

..................................................................................................39</b><br></p><p>4.0 IMPORTANCE OF THE SEQUENCE OF CONCRETE PLACEMENT..........39&nbsp;</p><p>4.1 Problem Analysis......................................................................................... 39&nbsp;</p><p>4.2 Simplified Structural Analysis......................................................................... 41&nbsp;</p><p>4.3 Proposed Improvements for Construction .................................................... 45&nbsp;</p><p>4.4 Summary........................................................................................................ 45&nbsp;</p><p><b>

Chapter FIVE

.....................................................................................................48</b><br></p><p>5.0 CONCLUSIONS AND RECOMMENDATIONS ..........................................48&nbsp;</p><p>5.1 Conclusions................................................................................................... 48</p><p>&nbsp;5.2 Recommendations........................................................................................ 49&nbsp;</p><p>APPENDIX A MEASURED DATA FOR THE SPACING OF SHORES ..............................................................................................................................50&nbsp;</p><p>B MEASURED DATA FOR THE INCLINATION OF SHORES..............................72&nbsp;</p><p>LIST OF REFERENCES......................................................................................74&nbsp;</p><p>BIOGRAPHICAL SKETCH ..................................................................................76&nbsp;</p>

Thesis Abstract

<p>             <b>ABSTRACT&nbsp;</b><br></p><p> This thesis presents the importance of the sequences of placing fresh concrete and other variables as a measurement to prevent elevated formwork failures in high-clearance reinforced-concrete buildings. To do so, the research was conducted to examine load paths of fresh concrete on projects being constructed in Nigeria. Recommendations from the research provide improvements to the construction processes for elevated formwork and strengthen the safety considerations as well as suggest a guide for better practices in the design and construction of elevated formwork in the future. The results of this thesis are summarized as follows&nbsp;</p><p>First, as a result of structural analysis of the sequence of placing concrete in relationship to current construction practices, when fresh concrete is placed, such as one way placement toward a short side, the possibility of the sudden collapse resulting from the unexpected lateral force is not usually a design consideration for high-clearance elevated formwork.&nbsp;</p><p>Second, construction of components of elevated formwork in cases where the height of each story is above 3.5 m should be considered during concrete construction. Operations of components are as follows the installation of the horizontal bracing and the diagonal bracing, the plumb of shores, and the exact installation of rows and columns of shores.&nbsp;</p><p>Third, the interconnection between the wall form and the slab form, which is one of the methods to prevent the lateral force in case of high-clearance elevated formwork, is perfunctorily executed. Also, the spacing of shoring is observed to meet the specifications to some degree, but the shores are not closely tied together with the upper and lower part. Because binding is difficult to realize, it is necessary to regulate or specify the criterion.&nbsp;</p><p>Finally, measurements to reduce the lateral force occurring in shores due to the sequence of placing fresh concrete are required by conducting structural analysis in many ways. It is important to consider conditions based on the construction field operations rather than to assume many constraint conditions.</p><p>&nbsp;Based on the finding in construction field operations, the thesis will be a great contribution to future research such as material experiment, structural analysis, and design as useful data to ensure the safety of elevated formwork. Also, the thesis will be used as the guideline when the preliminary planning is established for materials and construction in high-clearance reinforced-concrete buildings. <br></p>

Thesis Overview

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Building. 2 min read

Implementation of Smart Building Energy Management System...

The project titled "Implementation of Smart Building Energy Management System" aims to address the growing need for more sustainable and efficient ene...

BP
Blazingprojects
Read more →
Building. 4 min read

Implementation of Smart Building Automation System using IoT Technology...

The project titled "Implementation of Smart Building Automation System using IoT Technology" aims to explore the integration of Internet of Things (Io...

BP
Blazingprojects
Read more →
Building. 2 min read

Development of an Energy-Efficient Smart Building System...

The project titled "Development of an Energy-Efficient Smart Building System" aims to address the growing need for sustainable and environmentally fri...

BP
Blazingprojects
Read more →
Building. 3 min read

Integration of Renewable Energy Sources in Building Design for Enhanced Sustainabili...

The project titled "Integration of Renewable Energy Sources in Building Design for Enhanced Sustainability" aims to explore the integration of renewab...

BP
Blazingprojects
Read more →
Building. 2 min read

Implementation of Green Building Technologies for Sustainable Construction Practices...

The project titled "Implementation of Green Building Technologies for Sustainable Construction Practices" focuses on the integration of environmentall...

BP
Blazingprojects
Read more →
Building. 4 min read

Design and Implementation of a Smart Energy Management System for Residential Buildi...

The project titled "Design and Implementation of a Smart Energy Management System for Residential Buildings" aims to address the growing importance of...

BP
Blazingprojects
Read more →
Building. 2 min read

Design and Construction of a Sustainable Green Building Using Recycled Materials...

The project titled "Design and Construction of a Sustainable Green Building Using Recycled Materials" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more →
Building. 4 min read

Analysis and optimization of energy consumption in smart buildings....

The research project titled "Analysis and Optimization of Energy Consumption in Smart Buildings" aims to investigate and improve the energy efficiency...

BP
Blazingprojects
Read more →
Building. 4 min read

Design and Analysis of Sustainable Building Materials for High-Rise Structures...

The project titled "Design and Analysis of Sustainable Building Materials for High-Rise Structures" aims to address the increasing need for environmen...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us