Home / Building / ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

 

Table Of Contents


Thesis Abstract

<p> </p><div>Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery.Analytical and approximate variance of public building total project cost, estimation by mean component costs method.This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the expected time. The major issue, is the project cost which dictates its success. Project cost variance has been affecting the speedy and successful delivery of building construction projects. The key fact in this study method was to collect and analyse public building project cost estimates containing building components, which includes preliminaries, substructure, superstructure, mechanical/electrical, external works and contingency in the bill of quantity (BOQ) from projects handled by Education Trust Fund(ETF) in the tertiary institutions located in Kaduna, Kwara, Kogi and Abuja from 2009 to 2010. The study adopted mean component cost method modeled by Skitmore and Ng (2002) to determine the projected cost variance of the Lecture Theatres and Lecture Rooms handled by the organization in various tertiary institutions in Nigeria. The analysis of the data collected was made by using standard method of analysis which employs SPSS for the project costs.Skitmore and Ng (2002) model was employed to test the variability of the project cost data. The result shows that; the building component cost data 4782.50 had closer link to the mean 4773.92(mean) for preliminaries component column in project ID 4 of Lecture Theatreandanother component data 2797.62 is also close to 2312.91(mean) for Ext.Wkscolumn in project ID 7 for the Lecture Theatre building projects butfor the Lecture Classrooms building the preliminaries column had 1531.41 and 1416.33(mean) in project ID 2 and 1611.22 and 1673..58(mean) for M/E column for project ID 5. This project therefore concludes in addition to the results of the cost variances, that the lecture theatre and classrooms projects are underestimated.Interview was also conducted on the professional estimators in building industry. Moreover significant differences exist among the components in those public buildings.The analytical calculation shows that the correct variance for an average lecture theatre project from this research was found to be 34.73%. The sample analyzed had shown that the correct variance of the class room was found to be 38. 50%. Therefore lecture theatre is observed to be a better building project than the class room building. The study recommends the need to minimize the occurrence of the overrun by thoroughly crosschecking the initial estimate and addressing other technical issues before the contract is awarded. It also recommends the employment of the mean component cost method of analysis and setting of a committee to properly scrutinize the estimate.</div><br> <br><p></p>

Thesis Overview

<p> </p><div>In the building construction industry, it is a formal procedure to determine the initial cost of a building project before awarding the contract. This is in order to ascertain the financial level of the client whether the project is worth undertaking. The underlyingfact is because of the instability of the market prices of material, labour and equipment which are the major tools involved in the construction.</div><div>The wave of project production cost variability in the recent time calls for a concern in the building industry. If a building project cost estimate is presented for tender and the contractor gives his quotations, with all necessary adjustment made and contract is awarded, it is not likely that the agreed contract price will still be the final project cost at completion. The final project cost is often found to be higher at completion.</div><div>There are many factors leading to the changes in the final cost. Giwa (1998) had stated that the effect of change between the initial and the final cost incurred constitute a major problem in the building industry, especially between the client and estimator. This cost differential is called cost variance in the building construction industry. Cost variance is significant for general cost planning, and can be a big problem to solve by the managers in the building industry.</div> <br><p></p>

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Project Journal Publishing
🎓 Undergraduate/Postgraduate
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Building. 3 min read

Implementation of Smart Building Energy Management System...

The project titled "Implementation of Smart Building Energy Management System" aims to address the growing need for more sustainable and efficient ene...

BP
Blazingprojects
Read more →
Building. 2 min read

Implementation of Smart Building Automation System using IoT Technology...

The project titled "Implementation of Smart Building Automation System using IoT Technology" aims to explore the integration of Internet of Things (Io...

BP
Blazingprojects
Read more →
Building. 4 min read

Development of an Energy-Efficient Smart Building System...

The project titled "Development of an Energy-Efficient Smart Building System" aims to address the growing need for sustainable and environmentally fri...

BP
Blazingprojects
Read more →
Building. 2 min read

Integration of Renewable Energy Sources in Building Design for Enhanced Sustainabili...

The project titled "Integration of Renewable Energy Sources in Building Design for Enhanced Sustainability" aims to explore the integration of renewab...

BP
Blazingprojects
Read more →
Building. 3 min read

Implementation of Green Building Technologies for Sustainable Construction Practices...

The project titled "Implementation of Green Building Technologies for Sustainable Construction Practices" focuses on the integration of environmentall...

BP
Blazingprojects
Read more →
Building. 3 min read

Design and Implementation of a Smart Energy Management System for Residential Buildi...

The project titled "Design and Implementation of a Smart Energy Management System for Residential Buildings" aims to address the growing importance of...

BP
Blazingprojects
Read more →
Building. 4 min read

Design and Construction of a Sustainable Green Building Using Recycled Materials...

The project titled "Design and Construction of a Sustainable Green Building Using Recycled Materials" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more →
Building. 2 min read

Analysis and optimization of energy consumption in smart buildings....

The research project titled "Analysis and Optimization of Energy Consumption in Smart Buildings" aims to investigate and improve the energy efficiency...

BP
Blazingprojects
Read more →
Building. 3 min read

Design and Analysis of Sustainable Building Materials for High-Rise Structures...

The project titled "Design and Analysis of Sustainable Building Materials for High-Rise Structures" aims to address the increasing need for environmen...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us